Your privacy choices

KiwiBee uses optional Google Analytics, Google Ads, and Meta Pixel cookies to understand adult visitors, measure completed sign-ups, and improve campaigns. Essential cookies always stay on. OpenAI’s ChatGPT Ads Pixel also measures page views and completed enquiries after advertising consent, and may use hashed contact details for matching. Privacy policy

Skip to main content
Printable worksheet

A Team Project Under Pressure

QuizOtherGrade 9English
Quiz worksheet

Practise more with these

Picked by meaning from games, worksheets, simulations, teacher tools and videos.

On this sheet

The words and questions from the game

  1. 1A project plan needs a builder, tester and recorder. What should role allocation check?Only which name appears first on the roster · Only who speaks loudest · Only a preferred job title · Required tasks, availability and stated capabilities
  2. 2A role assignment does not itself prove that the assigned task is complete.True · False
  3. 3Testing requires a finished prototype. The build is delayed. Which task is directly affected?No task can be affected by a build delay. · That prototype’s testing · An independent poster task necessarily · Every unrelated task by definition
  4. 4Two independent tasks can run at the same time with separate resources. What is possible?Parallel work · Completion before either starts · A required serial delay by definition · Neither task can begin until both are complete.
  5. 5Order the stated dependency chain.
  6. 6A deadline makes missing evidence count as completed testing.True · False
  7. 7A shared tool can be used by only one task at a time. What must the schedule account for?A guarantee of simultaneous use · An assumption that one tool can be in both tasks simultaneously · The resource conflict · Only the tool’s colour
  8. 8Two independent tasks always require twice as much elapsed time as either one, even when parallel resources are available.True · False
  9. 9A log shows 8 completed tests out of 12 required. What fraction is completed?Two thirds · One half · One third · All
  10. 10A team spent most of its time but has few verified outputs. What is a constructive response?Count time spent as proof all tests passed. · Hide the log · Inspect bottlenecks and revise the plan using completion evidence · Declare all outputs complete
  11. 11A team member becomes unavailable. What respects both the task and the people involved?Assign every missed task silently to one person · Agree revised responsibilities and check the new schedule · Pretend the absence has no effect · Mark the unavailable member's tasks complete without doing them.
  12. 12A setback can justify revising a forecast while preserving truthful status records.True · False
  13. 13Order these dated status reports.
  14. 14An optional decoration task consumes time needed for a mandatory test. Which action follows a brief prioritising mandatory outputs?Keep decoration and claim the test happened · Delete the test record · Rename decoration as testing without running a test. · Reallocate time to the required test
  15. 15Why separate “built,” “tested” and “approved” in a progress log?Approval happens automatically whenever building starts. · The words must always mean identical things · They represent different completion states · It makes missing stages disappear
  16. 16The fastest proposed plan is feasible even if it double-books the only available tool.True · False
  17. 17Which evidence supports an improved forecast?Only an optimistic slogan · The initial estimate despite new failures · Only the number of people looking busy · Actual remaining work and available capacity
  18. 18Which response to disagreement is constructive under an evidence-first rule?Hide the conflicting evidence · Compare the recorded dependencies and resource limits before choosing · Choose whoever shouts longest · Invent dependencies to favor a preferred person.
  19. 19Which final review integrates allocation, progress and setbacks?Verify role coverage, compare logged outputs with requirements and agree a feasible evidence-based revision · Keep every old date regardless of changed resources · Treat effort as proof of every outcome · Remove every unresolved setback from the progress log.

About this worksheet

A printable worksheet made from the KiwiBee game “A Team Project Under Pressure”. Open it in the free Worksheet Studio to choose the design and the sheet type, then print it or save a PDF.

A 28-question progressive quiz connecting three skills through explicit observations, data and scenarios.

  • ms 294
  • arts life skills
  • allocate roles and resources
  • interpret progress data
  • choose a constructive response to a setback

Comments

    A Team Project Under Pressure: Quiz worksheet | KiwiBee