A Budget for a Class Project
Practise more with these
Picked by meaning from games, worksheets, simulations, teacher tools and videos.
On this sheet
The words and questions from the game
- 1A project requires a base costing 8 tokens. Decoration is optional. Which cost is required?Any decoration by definition · The base cost · The price of an optional sticker · Every item in a catalogue
- 2A fixed one-time cost and a per-person cost should be counted differently.True · False
- 3Ten participants each need a 2-token kit. What kit cost should be included?20 tokens · 10 tokens total · 2 tokens total · 12 tokens
- 4A plan has 8 tokens of fixed cost and 20 tokens of kits. What is the total?160 tokens · 20 tokens · 28 tokens · 12 tokens
- 5The specified budget process is list requirements, total costs, compare with the limit. Order it.
- 6An optional item is automatically affordable because it is optional.True · False
- 7Which comparison keeps quantities matched?Compare one kit with ten kits without adjustment · Choose by package size alone · Compare only package colors. · Compare total costs for the same number of suitable kits
- 8The lowest total price always meets every functional requirement.True · False
- 9A class needs 12 suitable kits. Pack A contains 6 for 10 tokens; Pack B contains 4 for 8. Which complete purchase costs less?The costs are equal · Two A packs at 20 tokens · One A pack at 10 tokens · Three B packs at 24 tokens
- 10A delivery fee is not included in the quoted item total. What needs checking?A promise that fees never matter · Assume the unquoted delivery fee is zero. · Only the package colour · The fee before claiming a full total
- 11A required price rises, putting the plan 3 tokens above budget. An optional item costs 4 tokens. Which revision follows the brief and brings the plan within budRemove an optional item while keeping every requirement · Delete a requirement without approval · Hide the extra cost · Keep all optional items and pretend the budget increased.
- 12A revised budget should use the updated price rather than the old estimate.True · False
- 13Order these costs from least to greatest.
- 14The revised plan is cheaper but provides only 9 of 12 required kits. What is the problem?The missing kits are guaranteed free · Nine kits automatically satisfy any twelve-kit requirement. · It fails the quantity requirement · Every cheaper plan is automatically valid
- 15Which explanation justifies a budget choice?It ignores the reserve to appear cheaper · It is cheapest because required delivery was omitted. · It has the best-looking receipt · All 12 kits, delivery included, stated reserve kept.
- 16Which final review is complete for the stated model?Assume the first draft remains correct forever · Check only one attractive item price · Recheck quantities, unit prices, fixed fees, reserve and total against the limit · Check only the number of letters in each item name.
About this worksheet
A printable worksheet made from the KiwiBee game “A Budget for a Class Project”. Open it in the free Worksheet Studio to choose the design and the sheet type, then print it or save a PDF.
A 24-question progressive quiz connecting three skills through explicit observations, data and scenarios.
- ms 280
- arts life skills
- distinguish fixed and optional needs
- compare token costs
- revise a plan within a limit